Project N-ing

Projects

Sorman - Bir Ayad, Libya

SORMAN - BIR AYAD by N-ing

Description:

Client expressed a wish to develop traffic infrastructure and its further connection with respective national and local traffic system in order to provide quick and efficient movement of passengers and goods.

According to expected volume of traffic in future period, client found out that roadway with one lane for both directions on section Sorman –Bir Ayad does not meet desired needs. For this purpose we made design of second lane from Sorman town, placed on Mediterranean Sea, up to intersection Bir Ayad.

Following effects shall be achieved by planned works on existing route Sorman – Bir Ayad:

  • Improvement of safety and reliability of road traffic
  • Standardizing and increasing of driving speed
  • Shortening of travel time
  • Improvement of maximum road capacity

N-ING team of engineers successfully finished all stages of project, that included Surveying, Alignment design, Pavement design, Structural design, Drainage systems, Earthworks calculations…

Client:

Roads and Land Authority - Ministry of Communication and Transportation Libya

Dates (from - to):

2013 - 2014

Consortium:

N-ING, Alsedq

Services provided by N-ING:

  • Surveying
  • General design
  • Preliminary design
  • Final design
  • Cost analysis